Pantanha stream re-naturalization and Urgeiriça’s new tailing dam
CONCEPTUAL DESIGN / SERVICES CARRIED OUT
Repackaging, stabilization and drainage of the radioactive ore tailings and landscape design.
Restitution of the streams original bed.
Environmental monitoring.
LOCATION
Nelas, Portugal
SERVICE DATE
N/A (Detailed design conclusion, 2010)
GENERAL FEATURES
165.000m3 of tailings.
19 ha landscape rehabilitation.