Bridge over Sabor River
CONCEPTUAL DESIGN / SERVICES CARRIED OUT
Unicellular box girder deck, in pre-stressed concrete, built by balanced cantilever method. Central piers with a maximum height of 75m are pre-stressed eccentrically to balance the effects of the circular curve in plan and require footings anchored to the rock. .
LOCATION
Sardão/Meirinhos, Portugal
SERVICE DATE
2003
GENERAL FEATURES
Length: 560 m
Main span: 160 m
Width: 13 m