Bridge over the river Gilão



CONCEPTUAL DESIGN / SERVICES CARRIED OUT

Unicellular box girder deck, in prestressed concrete, built by balanced cantilever method, with segments cast “in-situ”, over four piles. The side spans were constructed over ground supported formwork and connect to the central part of the deck. Reinforced concrete piles foundation ∅1,50m with 40,0 m of depth.

LOCATION

Tavira, Portugal

SERVICE DATE

1994

GENERAL FEATURES

Length: 218 m
Main span: 70,0 m
Width: 18,50m