New bridge of Lavandeiras



CONCEPTUAL DESIGN / SERVICES CARRIED OUT

Unicellular box girder deck, in prestressed concrete, built by balanced cantilever method, with segments cast “in-situ”. The side spans were constructed over ground supported formwork and connect to the central part of the deck.

LOCATION

Montemor-o-Velho, Portugal

SERVICE DATE

2002

GENERAL FEATURES

Length: 150m
Main span: 65m
Width: 10.50m