N120 – Rehabilitation and Strenghtening of the Odemira Bridge over Mira river








CONCEPTUAL DESIGN / SERVICES CARRIED OUT
Replacement of the concrete deck slab with a new one in light concrete.
Addition of reinforcement steel plates.
Surface treatment of damaged metal areas.
Widening of the walkways.
LOCATION
Odemira, Portugal
SERVICE DATE
2012
GENERAL FEATURES
Length: 135 m
Main span: 42,5 m
Width: 9,00 m
Steel bridge built in 1940