Road axis of integration “Valles del Tuy”



CONCEPTUAL DESIGN / SERVICES CARRIED OUT

The Basic and Detailed Design included the following aspects:
• Road capacity analysis
• Road geometry
• Structures
• Geology and Geotechnics
• Earthworks
• Drainage
• Retaining walls and slope stabilisation
• Road Signs
• Lighting

LOCATION

Santa Lucia – Kempis, State of Miranda, Venezuela

SERVICE DATE

2016 (Predicted)

GENERAL FEATURES

• Length: 24 km
• Cross section: 2 x 2 lanes (2 x 3 in the stretch with climbing lanes)
• 3 interchanges
• 8 redesigned intersected roads
• 4 roundabouts
• 5 emergency escape ramps
• 2 km of bridges and viaducts
• 10 underpasses and overpasses
• 32 retaining walls - HMAX: 65 m
• 34 cut slopes using nail stabilisation/ground anchors - HMAX: 110 m
• Earthworks: 16.2x106 m3