Rehabilitation of the Algodio Beach Cliffs, Ericeira





CONCEPTUAL DESIGN / SERVICES CARRIED OUT
Consolidation and stabilization of the sandstone-limestone-marl stands by means of sanitation, slope nailing, drainage, masonry walling and wire mesh protection.
Landscaping of the lower platform.
Recovery of the safety conditions in the area.
LOCATION
Ericeira, Portugal
SERVICE DATE
2006
GENERAL FEATURES
Extension of the intervention: 270 m
Maximum height of slopes: 20 m